03-31-2008, 10:33 PM
|
#13
|
|
Tri-State Addict
Join Date: Apr 2006
Location: Under a hood
Member #1764
My Ride:
Baaaaahd GTO
|
Quote:
Originally Posted by dragonfly2k3
If the job takes 9 hours it takes 9 hours. 4.2 hours would be the time it takes to complete the job on a brand new car assuming no problems. Everytime Ive ever gone to a shop you pay for the time it takes to do the job, not how long the manufacturer thinks it should take.
|
Its called flat rate.
|
|
|