When putting on the valve cover on an S13 and one of the rubber crescent moon shaped thingy falls into the oil pan.
Or my latest. When changing the y-pipe on my land rover. It is a total of 8 bolts. Six bolts in the front, three on each side of the V8 connected to the manifold and two connecting it to the rear of the exhaust. 2 each on both manifolds snap resulting in removing the manifolds and one of the rear bolts break. When removing the manifolds I used a torch and took my time heating the bolts so not to break any in the heads. If all the bolts came free it probably would have took a half hour. When all was said and done I think it added up close to 8 hours.
|